Parking Structure 1 Brick Facade Replacement

The project is to remove brick façade and replace it with an Acrylic Omega System, paint, replace traffic coatings at stair landings. The project also includes various repairs throughout the structure

  • Total Project Cost: $3,000,000
  • Construction State Date: June 2024
  • Construction Completion Date: December 2024
  • Project Delivery Method: TOCA, Penta
  • Architect: HPI
  • University Design and Construction Team: 
    • Tammy Dinh,, Project Manager 
    • Matthew Ramirez, Construction Engineer
    • Dana Morley, Project Engineer 
    • Tammy Hinds, Inspector of Record