Included are: updates to the original plan, reporting on significant tasks that were completed; what we expect to accomplish in 2008-09; areas of difficulty and barriers to completion; and comments on observations and discoveries.
1a. Accomplishments in 2007/2008 |
Adoption by the Academic Senate of the new Policy on Accessibility and Faculty Responsibility for the Selection of Instructional Materials, PS 08-11, on March 13, 2008. |
|
|---|---|---|
1b. Plans for 2008/2009 |
Continuing refinement of business processes associated with the adoption of textbooks by the University Bookstore, the various Colleges, and the Division of Academic Affairs in consultation with Disabled Student Services. |
|
1c. Barriers to completion |
The sheer magnitude of materials that must be addressed; lagging efforts at achieving accessibility goals (in some cases) by product suppliers. |
|
1d. Observations/discoveries |
There is an existing willingness to achieve compliance; however, time and effort will be required to attain the full level of accessibility desired. |
|
2a. Accomplishments in 2007/2008 |
High Tech Center staff in Disabled Student Services (DSS) acquired secure access to the university’s admissions and records data in Fall 2007. Students who self-identify with DSS are provided priority registration status. Multiple modes of communication are employed to ensure the broadest coverage possible. Procedures are in place to provide media producers with information regarding needed alternates for students with disabilities. |
|
|---|---|---|
2b. Plans for 2008/2009 |
Efforts to continue improving the identification and tracking of students with disabilities remains a fundamental objective. |
|
2c. Barriers to completion |
The primary barrier to attaining completion in this particular area is based upon the untimely and sudden passing of the HTC Coordinator. Continuation of these efforts will be slowed by the need to replace this key individual. |
|
2d. Observations/discoveries |
|
|
3a. Accomplishments in 2007/2008 |
The DSS High Tech Center’s Alternative Media Project Leader manages all alternative media requests; makes initial contact with publishers for copyright permissions and e-text requests; acquires alternative media from publishers, the CSU CAM project, or other national repositories; oversees the production of e-text textbooks; and keeps record and tracks all requests, acquisitions, and production tasks. |
|
|---|---|---|
3b. Plans for 2008/2009 |
Pending approval of the required resources, student assistants will be hired and trained to assist the Alternative Media Project Leader with the editing, formatting, and conversion of instructional materials. The necessary budget was presented to the university Resource Planning Process (RPP) Committee in Spring 2008. (At this point the results of the budget request process are not yet known.) |
|
3c. Barriers to completion |
Lack of needed additional resources. |
|
3d. Observations/discoveries |
Total ATI resource needs of $1.2m were reduced and edited down to a request of approximately $500k. This represents a major non-budgeted expense, which is particularly daunting in the context of the current State budget crisis. |
|
4a. Accomplishments in 2007/2008 |
After participating in the CSU Learning Management System (LMS) review process, it was determined that the university’s Blackboard-based LMS does not meet CSU ATI requirements. A broadly representative LMS Task Force has been formed with the charge of providing a recommendation to the Provost for an ATI-compliant product by mid-October 2008. |
|
|---|---|---|
4b. Plans for 2008/2009 |
To complete the LMS review process, select a compliant product and begin the process of migrating all LMS-based courses (currently estimated at approximately 50% of all courses offered) to the new LMS. In the process, ensure that all migrated courses are fully ATI compliant. |
|
4c. Barriers to completion |
The magnitude of the effort required to switch LMS platforms and do the necessary course conversions. |
|
4d. Observations/discoveries |
Although approximately only 50% of all courses offered are LMS-based, approximately 86% of all students access the LMS in the course of their academic career. Therefore, achieving full ATI compliance of all LMS-based courses will have a substantial impact. |
|
5a. Accomplishments in 2007/2008 |
ATI Awareness has been raised by discussions in the Academic Senate, Senior Management Council, Resource Planning Process, and in College and Department meetings. A cross-divisional ATI working group has been formed to guide the implementation of the needed changes. |
|
|---|---|---|
5b. Plans for 2008/2009 |
A commitment to continue establishing an awareness foundation, beginning with the practice of offering accessibility training sesions (two per week) throughout the 2008-09 academic year. |
|
5c. Barriers to completion |
Relate to the existing heavy workloads; perception of over-complicated requirements and procedures; and the general lack of reflection on the impacts of non-compliance on disabled students. |
|
5d. Observations/discoveries |
The exposure of faculty and staff to the complexity facing disabled students and their unique needs greatly enhances sensitivity to the issues. Building empathy for individual students generally overcomes antipathy toward perceived bureaucratic imposition by remote entities not directly involved in the delivery of services to students. |
|
6a. Accomplishments in 2007/2008 |
The CSULB ATI Steering Committee was formed with representatives from all areas of the university. The aforementioned ATI Working Group also includes individuals from all divisions. There is broad acceptance of the model of working together to achieve eventual full compliance. |
|
|---|---|---|
6b. Plans for 2008/2009 |
To continue cross-divisional cooperative efforts to achieve the objectives of the CSULB IMAP. |
|
6c. Barriers to completion |
These include staff turnover, pressures of other responsibilities, lack of needed additional resources, and the current State budget crisis. |
|
6d. Observations/discoveries |
There is a widely shared desire to achieve the highest practical level of ATI compliance as soon as possible. |
|
7a. Accomplishments in 2007/2008 |
The ATI Working Group has formulated an Accessibility Operating Plan for the purpose of achieving specific IMAP goals in 2008-09. |
|
|---|---|---|
7b. Plans for 2008/2009 |
Complete the aforementioned LMS review process; implement the ATI training curriculum for web page producers at both the web page development and content publisher levels; and introduce pre-publication review processes to ensure compliance of materials at all levels. |
|
7c. Barriers to completion |
Lack of needed resources to speed the achievement of compliance, and the enormity of university web-based materials, both in and out of the LMS. |
|
7d. Observations/discoveries |
Awareness and attitudes are improving with regard to accessibility issues in general. |
|
8a. Accomplishments in 2007/2008 |
The number of eligible students requesting alternate format instructional materials in 2007-08 was identified and carefully tracked. Although the total number of students (45) is small compared to the total student body (37,000), no identified need was unmet. |
|
|---|---|---|
8b. Plans for 2008/2009 |
Continue efforts to identify, assist and track students with special needs. |
|
8c. Barriers to completion |
Student self-identification and referral is a challenging hurdle. |
|
8d. Observations/discoveries |
(None) |
|
9a. Accomplishments in 2007/2008 |
This is an area on the agenda to be addressed. |
|
|---|---|---|
9b. Plans for 2008/2009 |
Review needs and develop an implementation plan. |
|
9c. Barriers to completion |
Currently there is not enough information on the extent of this problem. |
|
9d. Observations/discoveries |
N/A |
|
10a. Accomplishments in 2007/2008 |
Identified and implemented (at various levels) a variety of tools to assist in multimedia conversion and delivery, such as LecShare Pro, Elluminate, Jaws, HiSoft ADA Software, etc. Identified needed resources in excess of $500,000, including 5.5 FTE new staff. |
|---|---|
10b. Plans for 2008/2009 |
Continue mitigation efforts until needed new resources become available; make a good faith effort to provide captioning and other services available to faculty and staff; and continue to raise awareness of issues and methods for identifying and resolving problems. |
10c. Barriers to completion |
Continued lack of needed resources. |
10d. Observations/discoveries |
The extent of multimedia resources used in instruction is staggering. As podcasting and screencasting become increasingly used by faculty, the need for training and for the availability of easy-to-use tools and procedures will become ever more critical. |
11a. Accomplishments in 2007/2008 |
N/A |
|---|---|
11b. Plans for 2008/2009 |
None |
11c. Barriers to completion |
N/A |
11d. Observations/discoveries |
We need to make materials and services accessible because it is the right thing to do. |
12a. Accomplishments in 2007/2008 |
Website accessibility training was conducted for a large group of university web developers. The course consisted of two four-hour sessions and a homework assignment. In addition, the planned ATI training curriculum for faculty was developed. |
|---|---|
12b. Plans for 2008/2009 |
Implement the ATI training curriculum with two sessions per week throughout the 2008-09 academic year. The goal is to train 800 individuals per year over a period of three years. |
12c. Barriers to completion |
Existing heavy workloads; apathy on the part of some individuals. |
12d. Observations/discoveries |
We plan to conduct the training for carefully selected groups at the beginning to encourage word-of-mouth promotion and acceptance. |
13a. Accomplishments in 2007/2008 |
All major governing bodies were involved in ATI discussions at some level. |
|---|---|
13b. Plans for 2008/2009 |
Plans are currently under development to provide training, both face-to-face and on demand. Through a variety of communication points, individuals with roles or responsibilities in this enterprise will receive appropriate information about the requirements, processes and procedures for equally effective access to course materials. Examples of such communications include the announcement of deadlines for print-based instructional materials, reminders of venues for training, and information on the procurement of accessible instructional materials. Current training efforts will be incorporated into the new plan. |
13c. Barriers to completion |
Lack of budget to support the initiative. |
13d. Observations/discoveries |
Presentation of the power point to various campus groups demonstrated the differences in how people view technology and its potential. It was particularly rewarding to learn how interested staff members, especially, were interested in assisting those who would most benefit from the ATI. |
14a. Accomplishments in 2007/2008 |
These efforts were just getting underway in 2007-08. |
|---|---|
14b. Plans for 2008/2009 |
Continue efforts to identify the scope of needed assessment efforts and the tools required to achieve compliance. |
14c. Barriers to completion |
Distributed model of faculty material development; responsibility of individual faculty to make their materials accessible. |
14d. Observations/discoveries |
This is a HUGE issue. |
15a. Accomplishments in 2007/2008 |
Selected Elluminate as the tool of choice for fostering online delivery of certain kinds of materials; conducted two separate pilot studies. |
|---|---|
15b. Plans for 2008/2009 |
To implement a university-wide license for Elluminate; offer it to all faculty and staff; and provide training on an ongoing basis, including ensuring that materials delivered are accessible. |
15c. Barriers to completion |
None |
15d. Observations/discoveries |
We were fortunate to identify early in the discovery process the necessary resources to implement this product. Initial pilot project successes have created a grass-roots demand for the product and interest is burgeoning without particular efforts at promotion. |
16a. Accomplishments in 2007/2008 |
N/A |
|---|---|
16b. Plans for 2008/2009 |
None |
16c. Barriers to completion |
N/A |
16d. Observations/discoveries |
None |
17a. Accomplishments in 2007/2008 |
Identification of LMS inadequacies with regard to accessibility (see number 4. above). |
|---|---|
17b. Plans for 2008/2009 |
The assimilation of Elluminate into the existing LMS; complete the LMS review process, and identify a compliant product and work toward a fully integrated system (including the CMS) beginning in the Fall of 2009. |
17c. Barriers to completion |
Budget restrictions coupled with pressures to increase student enrollment (increased student demand). All resources are stretched very thin. |
17d. Observations/discoveries |
We are fully committed to achieving ATI compliant inclusion within our various instructional support systems, regardless of how long it takes. |
None |
Year 2 IMAP Report Topics |
IMAP – per Coded Memo AA-2007-04 |
|---|---|
1. Timely Adoption - Specifically, scope of materials and late hire strategy. |
1, 2 |
2. Process – Details/ Personnel/ Calendar for Initiative |
9-11 |
3. Identification Resources and Allocation Commitments |
1-8 |
4. Institutional Policies & Procedures that support the ATI through curriculum and personnel reviews |
6, 7 |
5. Commitments from All Stakeholders |
1-8 |
6. Share Responsibilities |
1-8 |
7. Migration from Accommodation to Accessibility |
1, 2, 4, 5, 7 |
8. Early Identification of Students with Disabilities |
3 |
9. Process for the Electronic Capture of course materials |
1, 2, 4, 7 |
10. Multimedia |
5, 7 |
11. Incentives |
1-8 |
12. Training |
7, 8 |
13. Outreach, Communication, Awareness, Marketing |
8 |
14. Assessment of Faculty Materials to be made accessible. |
1, 2, 4, 5, 7 |
15. Tools for Document and Media conversion |
1, 4, 7 |
16. System Wide Shared Resources (CAM etc.) |
1-8 |
17. System integration |
1-8 |
18. Things not addressed by the preceding: challenges, findings, trends, problems, recommendations and conclusions |
1-11 |